Hacker News

You Can't Buy a Data Center

22 points by anujsharmax ago | 4 comments

gdevillers |next [-]

Will we see people being paid to host small single-GPU servers in their home ? I guess that would require redesigning the training system because the data transfer speed would be much slower with a higher latency. Maybe that is not even compatible with LLM training ?

thenthenthen |next |previous [-]

Dont forget suger cane: https://aisupplychain.vercel.app/

7777777phil |next |previous [-]

128 to 210 WEEKS for power transformers. You can fab more GPUs in 18 months but the electrical infrastructure to run them takes 3-4 years and there are maybe a handful of manufacturers. Feels like the stories from the telecom fiber overbuild of 2000 except this time the supply chain can't even overbuild if it wanted to.

ekropotin |previous [-]

I miss good’ol pre-LLM days so much