Romania shuts only nuclear plant as heat causes drop in Danube River level
ChrisArchitect
|next
[-]
Record heat is drying up Europe's major rivers, as these striking images show
preisschild
|next
|previous
[-]
petre
|root
|parent
[-]
"In March 2021 Nuclearelectrica stated it expected to commission unit 3 by 2031, starting construction in about 2024. The largely-new reactors will be updated versions of the CANDU 6, but not the full EC6 version, since the concrete structures are already built. Unit 3 was reported to be 52% completed and 30% for unit 4, though in 2017 the reported figures were 15% and 14%. They would have an operating lifetime of 30 years with the possibility of a 25-year extension."¹
CANDU 6 is open cycle. EC6 can work in a closed cycle with cooling towers. One just doesn't simply make alterations to nuclear power plant designs without the appropriate design, testing and certification. Unit 1 was also completed in 1996, so it's at near the end of its planned operating lifetime.
The Indian PHWR developed from the CANDU can also work in a closed loop.
For Romania there are other solutions, like redirecting flow through the Old Danube branch, which they already attempted through rock blasting and sinking a bunch of rock filled barges in order to buy two more weeks before shutting down the plant. This, of course, comes at a cost for shipping traffic.
preisschild
|root
|parent
[-]
> Make and model CANDU 6
> Unit 1, a CANDU 6-type,
> Four years later, Unit 2, another CANDU 6-reactor, achieved criticality