US test reactor cleared for operations
stuff4ben
|next
[-]
fhdkweig
|root
|parent
|next
[-]
gwbas1c
|root
|parent
|next
[-]
It's a little less than renewables and a little more than coal.
> I would be nice to see it be a nighttime base-load provider
The bigger issue with Solar is the dramatic difference in generation between the summer and winter. So not only do you need something for "nighttime," you also need something for "winter."
ninalanyon
|root
|parent
[-]
aliasxneo
|root
|parent
|previous
[-]
mikeyouse
|root
|parent
|next
[-]
Vogtle 3/4 saw negative learning rates (the second was more expensive to build than the first) and came in a decade behind schedule at over $20,000/KW. Enormous solar + storage projects are coming online at more like $2,500/KW. Their levelized cost is less than half the comparable cost to a nuclear plant without all the risk.
DrBazza
|root
|parent
[-]
At current prices, to power the UK for 36 hours off battery storage, it would cost (according to Gemini) £150bn to £400bn for the batteries alone - that doesn't include purchasing land, wiring them up and so on, nor the cost of the wind farms and solar panels to feed the batteries. We don't/can't/won't do hydro pumped storage in the UK.
Sizewell C, our massively overpriced nuclear power station, comes in at about £100bn.
Rolls Royce SMR for Czechia at 0.5GW is about £3bn - https://en.wikipedia.org/wiki/Rolls-Royce_SMR#Cost
The current dunkelflaute with no wind, and little sun, in Northern Europe has been 3 days, or 72 hours. This is a regular occurence.
The longest dunkelflaute was the winter of 1996/97, for 55 days.
mikeyouse
|root
|parent
|next
[-]
Sizewell C, our massively overpriced nuclear power station, comes in at about £100bn.
It comes in at £100bn for 3GW - that's about 7% of total UK consumption. A huge amount to be sure, but the choice isn't £100bn for Sizewell or £400bn for batteries.
Rolls Royce SMR for Czechia at 0.5GW is about £3bn
To be clear - this doesn't exist. They "aim" to start construction in 3 years and it's a FOAK project so will surely be delayed. The initial target was a cost of £2bn - the paper cost has already increased by £1b without a shovel turning over a single grain of sand.
It's a huge shame and problem across the 'West' - but we can't build megaprojects for anything resembling a reasonable cost any more.
gwbas1c
|root
|parent
|next
|previous
[-]
mikeyouse
|root
|parent
[-]
The wholesale price coming out of Hinckley will be higher than the retail price in most of the US.
hunterpayne
|root
|parent
|next
[-]
nine_k
|root
|parent
|next
|previous
[-]
DrBazza
|root
|parent
[-]
https://www.theguardian.com/environment/2021/apr/28/sizewell...
stymaar
|root
|parent
|previous
[-]
Unsurprisingly it turns out financing such a long term project on a 10% rate debt is not a good idea. (Keep in mind that this debt has been borrowed during ZIRP, where the baseline interest rates where near 0, this rate is just the premium that private actors are taking for the risk to see such a project being canceled for political reason). Of course the sensible way to do it would have been to finance it on long term public debt guaranteed by the British govt, who would then have born the burden of an hypothetical cancelation of the projects (and the cost per MWh would have been 4 times lower IIRC), but public is a forbidden word for the Tories.
adrianN
|root
|parent
|next
|previous
[-]
topspin
|root
|parent
[-]
A couple more to deal with outages. Plus some battery capacity, which you want because nuclear doesn't load follow well. At £38 billion per, you need about £500 billion to power the whole country. About 40% of one annual UK budget.
It's possible to imagine building Sizewell C's at considerably lower cost, as is done it other nations that exist, and manage to build such things without the huge multipliers, but that's another matter.
hunterpayne
|root
|parent
[-]
AtlasBarfed
|root
|parent
|previous
[-]
Or just gas peak already.
But look, if data centers want to fund a whole bunch of advanced nuclear and wait 10 years for it to get built and will foot the bill for the cost overruns, okay I'm not going to stop them.
But let's face it all. This nuclear stuff which is going to be for data centers is all an externalized cost that's going to be dumped on the public.
fhdkweig
|root
|parent
|previous
[-]
silverFork
|next
|previous
[-]
stronglikedan
|root
|parent
[-]
xtiansimon
|next
|previous
[-]
Seems like the discussion of nuclear should start with how we manage the waste.
Into Eternity: A Film for the Future (FIN, 2010)